House demolition is a big project and must be well planned, prepared and incorporated within the laws of the area. It can be destroying an old house to build a new one, then clearing land to re-awaken it. It is always better to be aware of what is relevant.
The transformation of Melbourne is more than a simple contract recruitment and wall knocking. All actions involved in permits for waste management are to be done professionally to achieve safety, efficiency, and lawfulness. When you are planning a home demolition, you should know these 7 tips that would help you in the operation.
Know Local Regulations and Permits
Obtaining the necessary permits before any demolition project is one of the initial and most important activities. The local councils in Melbourne are very strict on rules concerning safety and the protection of the environment.
You will also require the application of a demolition permit and other planning approvals based on the zoning and heritage status of the property. Certain properties can also be heritage overlayed, either by reason of demolition being prohibited or particular permission being sought.
Always ensure you verify with your council before going ahead because it may attract fines and delays in casework if it is started without the necessary approval.
Find a Demolition Contractor with Experience
Not every contractor is prepared to deal with demolition. When planning a home demolition, one should use a licensed demolition firm that has experience in residential demolition in Melbourne.
Find a demolition company that has the experience, industry accreditation, and good safety records. Reviewing checks and recommendations can also assure you that the project will be completed on time and on budget.
Inspect Hazardous Materials.
The material used in older Melbourne houses may be hazardous, like asbestos, lead paint or mould. Any attempt to do it is risky and unlawful.
A hazardous materials assessment ought to be carried out by a qualified inspector prior to the commencement of the demolition process. Early detection of these risks will make it safe to remove and avoid contact with toxic substances.
The hazardous waste will be disposed of safely, as per the Victorian safety regulations, by a professional demolition team that will ensure your family and the local community are safe.
Disconnect Essential
Any demolition work cannot be conducted without disconnecting all services such as electricity, gas, water and telecommunication services. Such utilities are highly unsafe when left exposed, like fire management, flooding, and electrocution.
Utility providers should be warned in advance, since it might take time to be disconnected. Demolition contractors get a chance to be safe once the services are cut off, with no threat of accidental damage or risks. Ensure that before commencing demolition, disconnections are done.
Waste Management and Recycling Plan
Demolition also produces high volumes of waste, such as timber and bricks, metal and concrete. In Melbourne, responsible disposal is very strict, and a large part of the materials can be recycled or salvaged, in fact.
Home demolition planning also involves the consideration of the way that materials will be sorted, removed, and reused as much as possible.
When selecting a demolition firm that has sustainable waste management practices, the environment gains, and the disposal costs can also be lowered.
Inform Neighbours and Control Site Safety
Demolition is noisy, dust-filled and disturbing. It is natural and, occasionally, appropriate to inform your neighbours about the work which is to be conducted. Also, satisfied work timetables, projections of inconveniences and good chemical communication can make the relationship fruitful, and complaint barriers can be avoided.
There should be sufficient fencing, signs and dust control to make sure that the workers and the population are safe. A responsible contractor will make the location safe and minimise the risks during the undertaking of the project.
Prepare the Post-Demolition Steps
When the old structure is cleared, you will have to think over what follows. It could be the construction of the new home, site preparation, or landscaping, but the clear plan will assist in the smooth transition.
When you are rebuilding, you want to manage your schedule of demolition and construction. This eliminates unnecessary delays and decreases the cost of holding an empty site. By hiring a company which will provide both demolition and construction services, it might be easier, and everything could be monitored.
Collaborate with Professionals You Can Relax
In VWD Group, we are a house demolition business that specialises in safe and professional house demolitions in Melbourne. We handle all of the procedures, including obtaining permits and extracting dangerous substances, as well as clearing the site and disposing of waste, with many years of experience.
If you are planning a house demolition, we can make it easy and smooth. Call us today on 1300 893 366 or email us at info@vwdGroup.com.au.